U.S. 54 Expansion in Seward County - Nov. 14, 2023 - English / Bilingual Meeting / Reunión en Inglés / Bilingüe

Nov. 14 Public Meetings for U.S. 54 Expansion in Seward County

Date - November 14, 2023

Time - 5:30pm to 7:30pm

Location - Seward County Community College: Room/Cuarto: SW229D (1801 N. Kansas Avenue, Liberal, KS 67901)

Public Comment Period - November 14, 2023 to November 30, 2023

KDOT hosted an open house-style public meeting at 5:30 p.m. on Tues., Nov. 14 at Seward County Community College (1801 N. Kansas Avenue) for the U.S. 54 expansion project from U.S. 83 (the former Six Points intersection) to Tucker Road. Modified design options to reconfigure the former Six Points intersection were shared. The community-preferred options identified during the July 2023 public meetings have been advanced to present more detailed information and impacts for public consideration and input.

KDOT organizará una reunión pública informativa el martes 14 de noviembre a las 5:30 p.m. en Seward County Community College (1801 N. Kansas Avenue) para el proyecto de ampliación de la U.S. 54 desde la U.S. 83 (la antigua intersección de los Seis Puntos) hasta Tucker Road. Se han avanzado las opciones preferidas de la comunidad para presentar información e impactos más detallados para la consideración y para los comentarios públicos.

  • English Presentation at 5:45 p.m.  /  Presentación en inglés a las 5:45 p.m.
  • Bilingual Presentation at 6:30 p.m.  /  Presentación bilingüe a las 6:30 p.m.

This information can be made available in alternative accessible formats by contacting 785.296.3585 Voice/Hearing Impaired-711.

Esta información puede ponerse a disponibilidad en formatos accesibles alternativos al llamar al 785.296.3585 Discapacidad de Voz/Auditiva-711.

About the Project / Acerca del Proyecto

The U.S. 54 expansion project from U.S. 83 to Tucker Road includes reconfiguration of the former Six Points intersection and is currently in the discovery phase. The project will connect to the U.S. 54 four-lane expansion project currently under construction from Tucker Road to County Road O. The earliest projected start date for construction is 2028.

El proyecto de ampliación de la U.S. 54 desde la U.S. 83 hasta Tucker Road incluye la reconfiguración de la antigua intersección de los Seis Puntos y actualmente se encuentra en la fase de descubrimiento. El proyecto se conectará con el proyecto de expansión a cuatro carriles de la U.S. 54 actualmente en construcción desde Tucker Road hasta County Road O. Lo más pronto que podría comenzar la construcción es en el 2028.

Project Materials / Materiales del Proyecto

Public Meeting Presentation (English and Spanish) / Presentación de la reunión pública (Inglés y Español):

This information can be made available in alternative accessible formats by contacting 785.296.3585 Voice/Hearing Impaired-711.

Esta información puede ponerse a disponibilidad en formatos accesibles alternativos al llamar al 785.296.3585 Discapacidad de Voz / Auditiva -711.

Project Contacts / Contactos del Proyecto

Ron Hall
Southwest District Engineer
620-765-7074
ron.hall@ks.gov

Yazmin Moreno
Public Affairs Manager
620-765-7080
yazmin.moreno@ks.gov

Have Questions?

Do you have a question, comment, suggestion or concern? Contact us by emailing IKE@KS.gov or by using the message fields located at the bottom of every page. You can also find out more about how we put your ideas to good work with our local consult process here.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.